亚洲精品中文字幕久久|爆乳先锋资源91狼友社|亚洲AⅤ欧美一区二区|日韩一级AAAAA|亚洲日韩成人A片一区二区|黄色视频网址大全|免费日本看黄色视频|国产成人黄色大片|探花轻盈人妻爱国产精品在线|亚洲高清无码电影

News Of The Company
BLC 3 Hydropower Station Contract signed in Nay Pyi Taw, Myanmar
Release date:2011-03-02 source:原創(chuàng) browse:2562
Browse and share:

With the instruction and support of the leaders from the related departments and organizations such as Chinese Embassy in Myanmar, China EXIM Bank and the Chamber of Commerce, Union Resources & Engineering Co., Ltd. had won in the bidding of BLC 3 Hydropower Station Construction Project while the contract was signed between UREC and Ministry of Electric Power No. (1), Union of Myanmar, in Nay Pyi Taw on the 28th January, 2011.

BLC 3 is the third and lowest stage of the three-staged chain hydropower stations designed and planned to be built over the BLC River. It is about 25 kilometers to the south-east of Loikaw, the capital of Kayah and located at the right bank of the down stream of the BLC River, the upper stream of which is directly connected with the tail water of BLC 2 Hydropower Station. BLC 3 is approximately 5.25 kilometers from the meeting point of the down stream of the BLC River and the Nam Pawn River. The hydro power stored by Moybe Reservoir can be exploited and utilized through this station at the down stream, which has significant influence on Myanmar electrical system especially in the seasons of drought.

Contract signed by Chairman Feng Ke of UREC and Representative of the Owner

Leaders of UREC and Representatives of the Owner


copyright? 2022 All Rights  UREC  滇ICP備12005153號-1
    technical support:奧遠(yuǎn)科技